Description Customer and Project
The Basque Government contracted the NIP, S.A. services for writing the project and works management for construction of a new 2+6 units building for the CEP Muskiz Ikastola LHI Infant Education; this meant that the Ikastola building had to be enlarged because of not having the capacity for pupils available in the centre.
A new freestanding construction was proposed facing the current building. A two-storey, L-shaped building was developed housing 8 classrooms for pupils from 0 to 6, and the kitchen and dining rooms to serve both centres.
The two buildings are connected by a metallic porch that is perfectly integrated into the unit.
Tasks developed
- Draft
- Urbanization project
- Execution project
- Installations project: Cold water, Hot water, Solar heating installation, Ventilation, Gas, High voltage installation, Low voltage installation, Voice and data, Illumination, Emergency illumination, Anti-intrusion, Fire protection.
- Health and Safety study.
- Quality Control plan.
- Activity project.
- Works management, execution management, and Health and safety coordination.